WtE
WASTE-TO-ENERGY waste.impro-solution.com
Industrial Waste-to-Energy (WtE)

Project support from technology selection to import delivery and operational readiness

We help project owners and EPC teams execute WtE programs with controlled documentation, partner coordination, and shipment discipline so milestones stay stable.

What We Do

Clear workstreams used for feasibility stage, EPC stage, and delivery stage.

Technology screening

Match waste profile and site constraints with proven WtE process routes.

  • Waste characterization inputs and assumptions
  • Process route fit check (mass burn, RDF, AD, gasification)
  • Key package list and interfaces

EPC partner coordination

Align scope, responsibilities, and documentation requirements from day one.

  • Scope packaging and BOQ discipline
  • Approved vendor and OEM lists (if required)
  • Clarification register to reduce rework

Import delivery and readiness

Control inspection, packing, shipment release, and delivery tracking.

  • Document register for LC, customs, and commissioning
  • Packing inspection and shipment release workflow
  • Delivery timeline tied to site milestones

Delivery Control for WtE Packages

WtE fails when the interfaces are not controlled. This section focuses on execution discipline.

Core packages

Typical packages that need strict sequencing and documentation.

  • Waste receiving and bunker systems
  • Boiler, turbine, generator (as applicable)
  • Flue gas treatment and stack monitoring interfaces
  • Ash handling, metal recovery, and residue logistics
  • Electrical, control, and instrumentation packages

Control points

Execution controls to keep approvals and delivery aligned.

  • Document register with revision control
  • Inspection plan and acceptance checkpoints
  • Packing, marking, and spare parts traceability
  • Shipment release checklist and tracking cadence
  • Commissioning readiness pack coordination

China Partner Lane

A structured lane for China-based EPCs, OEMs, and technology providers to engage with clarity.

Partner capability screening and references
Documentation pack checklist and formats
Factory inspection and packing verification workflow
Shipment release control and delivery governance
Spare parts strategy for operation continuity
Single point coordination for Bangladesh delivery

Project Pipeline Focus

Where WtE opportunities usually start. Keep this section for owners and EPC teams.

Industrial zones and urban waste streams

City and industrial waste programs where stable feedstock and logistics planning matter.

Port and logistics belts

High-load areas where land, access, and utility interfaces must be planned early.

Municipal partnerships

Projects where collection, tipping workflow, and facility operations must stay aligned.

Start with a short introduction

Share location, estimated waste volume, preferred delivery model, and target timeline. We will reply with required inputs and a suggested workflow.

Email: info@impro-solution.com Group site